Changelog
All notable changes to this project will be documented in this file.
info
The format is based on Keep a Changelog, and this project adheres to Semantic Versioning.
You can read the Microsoft help if you want to update this app to the latest version and are not sure how to do this. We have also created this animation to show you how.
Important
- Do not update apps while users are working, as it can cause a disruption and loss of work.
- It is always best to install updates in a Sandbox first and test them to ensure no adverse effects.
28.0.2.0 - 2026-09-17
Added
- Configurable visual cues in production descriptions, including optional Production Scheduling symbols and an update for existing orders.
28.0.1.0 - 2026-08-29
Added
- Initial app release with the following capabilities:
- BOM cost and yield visibility — product yield %, process weight change %, scrap %, total input and output weight per batch, and cost per batch on the BOM Cost Shares screen. Yield is shown only on lines produced from a production BOM and is read from the production BOM version effective for the line; component lines show process weight change % instead. Scrap % comes from the production BOM line on component lines and from the routing line scrap factor % on capacity lines.
- Target batch size on the Top-Level Item and Selected Line fact boxes of the BOM Cost Shares screen, so the batch behind the per-batch weights and cost is visible alongside the lot size.
- Automatic expiration dates on manufactured output — rules per item, item variant, or item category, counted from either the work date or today's date, with an optional cap to the earliest expiration date of the ingredients consumed on the production order line. Rules are maintained on the new Item Output Expiration Date Setup list.
- Cancel Reservations Entries and Cancel Shopfloor Entries actions on released production orders, letting a planner reduce or restructure an order already in progress. Reservation cancellation also runs automatically when an order is refreshed, with the resulting date-conflict warning suppressed.
- Post Time Entries action on the shop floor time entries list, opening the posting batch job already filtered to the released production order behind the current entry.
- Shop floor awareness in Advanced Production auto finish — a routing line counts as finished when its Aptean shop floor status is Finished, a production order line with a shop floor status of Finished is treated as ready to finish, and a line with unposted shop floor time entries is held back. The outcome is recorded as Time Entry Result on the Auto Finish Production Order Log.
- Aptean Production Enh. Admin permission set covering the new table, pages, report and codeunits.